    How Long Does a Kitchen Renovation Take in London?

    15 June 2026

    Planning a kitchen renovation in London? Learn the full kitchen renovation timeline, from design and demolition through to installation and final finishing touches.

    Kitchen renovation in progress in London featuring a bespoke island, shaker cabinetry and installation work

    A kitchen renovation is one of the most valuable improvements you can make to your home, but one of the first questions homeowners ask is: how long will it actually take?

    The timeline for a kitchen renovation in London depends on several factors including the size of the kitchen, layout changes, structural work, bespoke cabinetry, and the complexity of plumbing or electrical upgrades.

    In this guide, we break down the full kitchen renovation process step-by-step so you know what to expect before work begins.

    If you’re also researching costs, read our 2026 Kitchen Renovation Cost Guide

    Typical Kitchen Renovation Timeline in London

    Most kitchen renovations take between:

    • 2–4 weeks for straightforward kitchen replacements

    • 4–8 weeks for full kitchen remodels

    • 8–12+ weeks for larger renovations involving structural work or extensions

    The timeline can vary depending on:

    • Custom-made cabinetry

    • Worktop lead times

    • Electrical upgrades

    • Flooring installation

    • Wall removals

    • Building regulations approval

    • Material availability

    Working with an experienced renovation company helps reduce delays and keeps the project organised from start to finish.

    Stage 1: Planning & Design (1–3 Weeks)

    The planning stage is one of the most important parts of any kitchen renovation.

    This includes:

    • Initial consultation

    • Measuring the space

    • Layout planning

    • Choosing cabinetry and finishes

    • Appliance selection

    • Lighting plans

    • Budget discussions

    At this stage, homeowners should also decide whether they want:

    • Open-plan layouts

    • Kitchen islands

    • Underfloor heating

    • Bespoke storage

    • Integrated appliances

    Good planning helps avoid costly changes later in the project.

    For inspiration, browse our completed kitchen renovation projects

    Stage 2: Ordering Materials (2–6 Weeks)

    Once the design is approved, materials and products are ordered.

    This may include:

    • Cabinets

    • Worktops

    • Appliances

    • Tiles

    • Flooring

    • Lighting

    • Plumbing fixtures

    Quartz and stone worktops often have longer lead times, especially for bespoke fabrication.

    Delays commonly happen when products are ordered late, which is why experienced contractors usually coordinate ordering early in the process.

    Stage 3: Strip-Out & Demolition (1–3 Days)

    The old kitchen is removed before installation begins.

    This stage may include:

    • Removing cabinets

    • Taking out appliances

    • Removing tiles

    • Lifting flooring

    • Disconnecting plumbing and electrics

    If structural work is required, demolition may take longer.

    A professional team will protect surrounding areas to minimise dust and disruption throughout the property.

    Stage 4: First Fix Plumbing & Electrics (2–5 Days)

    Once the kitchen is stripped out, the first fix begins.

    This includes:

    • New pipework

    • Electrical rewiring

    • Lighting positions

    • Extractor connections

    • Appliance wiring

    • Socket installation

    This stage is especially important in older London properties where outdated electrics may need upgrading to modern standards.

    Many homeowners also choose to install:

    • LED lighting

    • Under-cabinet lighting

    • Additional sockets

    • Smart kitchen features

    Stage 5: Flooring & Plastering (2–5 Days)

    Before cabinets are fitted, walls and floors are prepared.

    This may include:

    • Plastering

    • Wall repairs

    • Levelling floors

    • Tiling

    • LVT flooring

    • Engineered wood flooring

    Drying time for plaster and adhesives can affect the overall timeline.

    Stage 6: Kitchen Installation (5–10 Days)

    This is when the kitchen begins to take shape.

    Installation includes:

    • Cabinet fitting

    • Appliance installation

    • Worktop templating

    • Sink installation

    • Lighting fixtures

    • Splashbacks

    Bespoke kitchens may take longer depending on complexity.

    Quartz worktops are often templated after cabinets are installed, then fitted several days later once fabrication is complete.

    Stage 7: Final Finishing & Decoration (2–5 Days)

    The final stage focuses on finishing details and quality checks.

    This includes:

    • Silicone sealing

    • Painting

    • Final electrical testing

    • Plumbing checks

    • Cleaning

    • Snagging

    Professional finishing work makes a huge difference to the final appearance of the kitchen.

    What Can Delay a Kitchen Renovation?

    Common delays include:

    • Late material deliveries

    • Structural surprises

    • Plumbing issues

    • Custom worktop fabrication

    • Design changes during construction

    One of the best ways to avoid delays is by finalising decisions before work starts.

    Is It Worth Renovating Your Kitchen?

    A professionally renovated kitchen can:

    • Improve daily living

    • Increase property value

    • Improve storage and functionality

    • Create better entertaining space

    • Modernise older properties

    For many homeowners, the kitchen is the most important room in the house and one of the best long-term investments.

    Kitchen Renovations Across London & Home Counties

    We provide high-quality kitchen renovations in Chelsea, Richmond, London and Home Counties tailored to modern living, combining premium materials, practical layouts, and expert craftsmanship.

    Our services include:

    • Full kitchen renovations

    • Bespoke cabinetry

    • Flooring installation

    • Lighting upgrades

    • Plumbing & electrics

    • Open-plan kitchen layouts

    Explore our kitchen renovation services or contact us for a free consultation

    FAQs

    How long does a kitchen renovation take in London?

    Most kitchen renovations take between 4–8 weeks depending on complexity and material lead times.

    Can I stay in my home during the renovation?

    Yes, many homeowners remain in the property during kitchen renovations, although temporary kitchen arrangements may be needed.

    What causes delays in kitchen renovations?

    Material lead times, structural changes, and unexpected plumbing or electrical issues are the most common causes of delays.

    Do I need planning permission for a kitchen renovation?

    Most standard kitchen renovations do not require planning permission unless structural changes or extensions are involved.

    How much does a kitchen renovation cost in London?

    Costs can vary depending on the size of the kitchen, materials, layout changes, and overall scope of work. Our detailed guide to kitchen renovation costs in London explains average pricing, labour costs, and what can affect your renovation budget.